FPSO Cyrus Conversion (EPCIC)
TUFF Offshore managed the FPSO Cyrus Conversion project, delivering refurbishment, life extension, and integration services for the Persian Gulf's first FPSO.
Project Overview
The FPSO Cyrus project, owned by a National Oil Company, involved the conversion and life extension of a donor vessel to serve as the first FPSO in the Persian Gulf region. The project focused on overcoming technological and logistical challenges to meet tight timelines.
Project Details
The FPSO Cyrus project required extensive refurbishment and conversion of the donor vessel, as well as integration of topside modules from various international vendors. The donor vessel was refurbished and life extended, with topside modules integrated upon arrival in the UAE. Final commissioning activities were conducted before the vessel was sailed to the field for offshore installation.
Scope of Work
- Marine side refurbishment, repair, and life extension
- Topsides
- Substructures
- Mooring system including anchors, piles, and anchor chains
Key Facts
- Production: 35,000 BOPD
- Water Injection: 30,000 BWPD (Actual 45,000 BWPD)
- Storage: 714,000 bbls
- Offloading: 700,000 bbls
- Helideck: Bell 412/Equivalent
- Mooring: Spread mooring
- Design Life: 25 years
- Accommodation Facilities: 76+23
- Marine Utilities
Conclusion
The FPSO Cyrus Conversion project highlights TUFF's capability to manage complex EPCIC projects, delivering comprehensive solutions for vessel refurbishment and integration of topside modules. The successful completion of this project underscores TUFF's commitment to excellence and operational efficiency in the oil and gas sector.
More Projects
NOC ESO FEED Design Highlights
Tuff Offshore provided FEED designs and procurement services for NOC's VLCC conversion, ensuring cost-effective solutions and seamless project management.
FPSO Firenze
TUFF and Saipem partnered on the FPSO Firenze project, offering comprehensive services for assessment, upgrades, and pre-commissioning to ensure successful redeployment.
TANGO FLNG and FSU Excaliber
The TANGO FLNG and FSU Excaliber project involves TUFF providing construction supervision, engineering, and project controls for FLNG and FSU. TUFF's integrated team supports project execution, focusing on upgradation, life extension, and commissioning at Dubai Dry Docks, ensuring safe and efficient operations.
Got a project to discuss?
Connect with our team to explore how we can support your industrial project needs.